Thursday, November 26, 2015

Back to the Blog

After some time of non-blogging I am back!

Update of current projects:

Kitchen:
Not yet finished, currently getting quotes for splashbacks

Shed:
Finished, full and almost unusable

Fences:
Right hand fence and gate complete!

Left hand fence and gate ordered and should be complete before Christmas! Yaaaa

Caravans:

Uncle's Viscount:
As finished as it is likely to be, usable with working solar power etc

My Millard:
All done, painted, awning installed and working, solar power excellent (running a engel 24/7 for more than a year now), inside needs cleaning but not too bad!

Planning:

After fences we would like to sort out the Patio at the back, and a carport out the front.

We would also like to build a limestone retaining wall instead of the metal fence that currently retains the soil.

After limestone retaining wall with steps is installed a terrace for the grapevine to grow on.

A pool is also on our agenda, but will be a significant cost with all the rock breaking required...

Cheers

Slippery out!